Bouclage de l’A86 Ouest, France

The company

Management

Jean-Claude Amet

Underground Works Engineering
Jean-Claude Amet was born in 1953. He has spent his entire career in the underground works department at Campenon Bernard, where he got his start in 1975 as a site manager. In that position, he was involved in the hydroelectric project at La Coche, the Corbinières rail tunnel, the Marseilles metro, the hydroelectric project at Grand-Maison, and the Lyons metro river crossing.
In 1987, he was appointed works manager for the sewer outfalls at Créteil-Valenton and Vitry-Créteil and, in 1991, manager in charge of French provinces.
Since 1994, Jean-Claude Amet has been director in charge of underground-works engineering.

<< Back