The company

British Isles

Constructing a sustainable future | Projects ongoing | Previous projects | Organisation | Awards | Links | Contact

VINCI Construction Grands Projets first steps in the UK were made in 1992 with the construction of the second bridge on the Severn estuary, a cable stay bridge connecting England and Wales. Our branch in London was established to ensure the development of local long-term partnerships based in the UK.

This has permitted us to participate in the construction of three major sections of the Channel Tunnel Rail Link (CTRL 310, 350 and 410), the British part of the high-speed train between London and the Channel Tunnel, including the design and the construction of the North Downs Tunnel, the bridge on the Medway river and Thurrock, Rainham and Aveley viaducts. We also designed and constructed all the seven rail and road tunnels of the new Terminal 5 of Heathrow Airport in London.

The integrated construction-concession operation of the VINCI business model allowed us to be awarded the Newport Southern Distributor Road design and construction contract, which included the award winning City bridge crossing the River Usk (Green Apple Award/Structural Steel Design Award). We have completed at the end of 2008 the design and construction of the world’s second longest push-launched bridge (the Clakmannanshire bridge in Scotland), and in May 2010, the widening of the M1 near Nottingham (junction 25 to 28). Our teams have now started the work on the Lee Tunnel Project in London.

Designing and constructing major infrastructures and complicated structures in the UK in partnership with our British and Irish colleagues is our prime target.

Constructing a sustainable future

At VINCI Construction Grands Projets, we engineer solutions that are not only financially competitive, but work sustainably for the planet. Superior design and construction practises are helping us save 20,000 tonnes of CO2 emissions in two years.

At Clackmannanshire Bridge in Scotland we responded innovatively to sensitive environmental factors. We’ve left a legacy of reduced traffic congestion and pollution for local residents, and have enlarged the local wildlife habitat by hectares.

In our M1 widening project, the road planning material was 100% recycled and included neutralised tar in the sub base, avoiding their transfer to the hazardous waste treatment procedure. It contributes to a hefty 16,000-t CO2 equivalent emission reduction.

On the Hallandsas TBM project in Sweden, all the discharged water from the construction sites is monitored continuously quality and quantity wise before sent back to the natural environment. Also on this project, every chemical products used have been through a complete eco-toxicological evaluation regarding their impacts on human health and environment before being approved.

Just a few of the ways in which VINCI Construction Grands Projets demonstrates sustainability leadership.

Here are a few others:
Environment: Attitude Environment, Co2crete Impact, CO2 Attitude
Innovation Awards: (A)live on site garners the Safety prize
Morgan VINCI wins 2009 Green Apple Award
A recycling solution at the M1 central reservation worksite
M1 in the United Kingdom: 1 million hours achieved without a reportable accident requiring downtime
(A)live on site at the M1 worksite
Technical innovation for the piles of the Kincardine Bridge in Scotland
Pride of place for sustainable development at the Kincardine Bridge worksite in Scotland
Environment: Excellent rating for the EIB’s new building
AFAQ 1000NR certification from AFNOR

Top

 

Projects ongoing

Top

 

Previous projects

Top

 

Organization

Pierre Berger*
CEO

Jean-François Ravix*
Executive Vice President
Director France Europe America Area

Eric Chambraud
Managing Director, British Isles and North America

Lionel Ravix
Deputy Managing Director, British Isles

Pierre Paré
Administration and Finance Director, British Isles and North America

Martine Julia-Sanchez
Sustainable Development Director, British Isles and North America

Clarence Michel
Marketing and Communication Manager, British Isles

Pierre Villard
Project Manager,
M1 - J25-28 Project

* Head Office Paris

Top

 

Awards

Health & Safety Assessment - Highways Agency
2010


Download (PDF File 0,7 Mb)

Dial-up : 1 min 39 s
Broadband : 3 s
Constructing a sustainable future
2010


Download (PDF File 0,2 Mb)

Dial-up : 29 s
Broadband : 1 s
Constructing a sustainable future
2010


Download (PDF File 0,2 Mb)

Dial-up : 30 s
Broadband : 1 s
Bulletin VINCI UK - February 2010
2010


Download (PDF File 2,2 Mb)

Dial-up : 5 min 26 s
Broadband : 9 s
2009 - Saltire Award - Clackmannanshire bridge
2009


Download (PDF File 0,7 Mb)

Dial-up : 1 min 39 s
Broadband : 3 s
2009 - Structural Awards - Clackmannanshire bridge
2009


Download (PDF File 0,4 Mb)

Dial-up : 55 s
Broadband : 2 s
2009 - CEEQUAL - Clackmannanshire bridge
2009


Download (PDF File 0,5 Mb)

Dial-up : 1 min 14 s
Broadband : 2 s
2009 - Green apple - Clackmannanshire bridge
2009


Download (PDF File 0,1 Mb)

Dial-up : 13 s
Broadband : 1 s
2009 - Green Hero - Clackmannanshire bridge
2009


Download (PDF File 0,5 Mb)

Dial-up : 1 min 9 s
Broadband : 2 s
2007 - Capability assessment toolkit
2007


Download (PDF File 0,1 Mb)

Dial-up : 17 s
Broadband : 1 s
2005 - Tunnelling - Airside Road Tunnel, T5, Heathrow Airport
2005


Download (PDF File 0,1 Mb)

Dial-up : 13 s
Broadband : 1 s
2005 - Structural Steel Design Awards - Newport Southern Distributor Road
2005


Download (PDF File 0,3 Mb)

Dial-up : 40 s
Broadband : 1 s
2005 - Concrete society award - CTRL 350 - Thurrock Viaduct
2005


Download (PDF File 0,3 Mb)

Dial-up : 40 s
Broadband : 1 s
2003 - Sustainability works - CTRL 310
2003


Download (PDF File 0,3 Mb)

Dial-up : 38 s
Broadband : 1 s
2003 - Sustainability works - CTRL 310
2003


Download (PDF File 0,3 Mb)

Dial-up : 45 s
Broadband : 1 s
2003 - Green apple environment awards - CTRL 310
2003


Download (PDF File 0,0 Mb)

Dial-up : 4 s
Broadband : 1 s
2003 - BCE awards - CTRL 310
2003


Download (PDF File 0,5 Mb)

Dial-up : 1 min 22 s
Broadband : 2 s
2002 - Tunnelling 2002 - CTRL 410 - North Downs Tunnel
2002


Download (PDF File 0,3 Mb)

Dial-up : 50 s
Broadband : 1 s
2002 - Concrete society award - CTRL 350 - Medway Viaduct
2002


Download (PDF File 0,2 Mb)

Dial-up : 36 s
Broadband : 1 s
2000 - 1 million man hours without a HSE reportable accident - CTRL 350
2000


Download (PDF File 0,8 Mb)

Dial-up : 2 min 4 s
Broadband : 3 s

 

Top

 

Links

Our projects

Clackmannanshire Bridge
http://www.transportscotland.gov.uk
http://www.flickr.com/photos/tgsimageengineer

Autoroute M1
http://www.highways.gov.uk/roads/projects/4347.aspx

Our joint venture websites

Morgan Sindall, VINCI Construction Grands Projets and Sir Robert Mc Alpine
http://www.mvm-jv.com

Balfour Beatty and VINCI Construction
http://www.balfourbeattyvinci.com

Morgan Sindall, Bam Nuttall, Balfour Beatty and VINCI Construction Grands Projets
http://www.forthspan.com

VINCI Construction UK, Balfour Beatty, Morgan Sindall and Beton und Monierbau
http://www.www.bbmv.co.uk

Our joint venture partners

Morgan Sindall
http://www.morgansindall.com

Sir Robert Mc Alpine
http://www.sir-robert-mcalpine.com

VINCI

VINCI advertising campaign
http://www.vinci.com

VINCI in the UK
http://www.vinci-uk.com

Top

 

Contact

VINCI Construction Grands Projets - British Isles
Grove House, 551 London Road - Isleworth - TW7 4DS
Tel: +44 208 587 1880
Fax: +44 208 587 1889
info@vinci-construction.co.uk

Top