As part of a lineage of 100-year-old companies whose names are associated with impressive achievements worldwide, VINCI Construction Grands Projets possesses end-to-end expertise in the creation of complex infrastructure.
Throughout the world, VINCI Construction Grands Projets designs and builds major civil engineering structures (tunnels, bridges, dams, liquefied natural gas storage tanks, road and rail infrastructure), buildings (skyscrapers, shopping centres, hotels), major industrial facilities, nuclear power plants, etc.
VINCI CONSTRUCTION GRANDS PROJETS IN THE BRITISH ISLES
VINCI Construction Grands Projets first steps in the UK were made in 1992 with the construction of the second bridge on the Severn Estuary, a cable-stayed bridge connecting England and Wales. Its branch in London was established to ensure the development of local long-term partnerships based in the UK. This has permitted us to participate in the construction of three major sections of the Channel Tunnel Rail Link: CTRL 410 (North Downs Tunnel); CTRL 350 (Medway River Crossing); and CTRL 310 (West Thames), including the in-house design of Thurrock, Rainham and Aveley viaducts.
VINCI Construction Grands Projets also constructed all the seven rail and road tunnels of the new Terminal 5 of Heathrow Airport in London.
VINCI’s integrated construction-concessions business model won the Newport Southern Distributor Road design and construction contract, which included the award-winning City bridge crossing the River Usk (Green Apple Award/Structural Steel Design Award).
At the end of 2008, we completed the design and construction of the world’s second longest push-launchedbridge (the Clackmannanshire Bridge in Scotland); in May 2010, the widening of the M1 near Nottingham (junction 25 to 28) and in February 2012, the advanced works for Tottenham Court Road Crossrail station (package C421).
Our teams are currently working on the Lee Tunnel Project in London, on the Liverpool Street and Whitechapel station tunnels for Crossrail (package C510), as well as the new Whitechapel Crossrail station (package C512).
Our prime goal is the design and construction of major infrastructure and complicated structures, working in partnership with our British and Irish colleagues.
Constructing a sustainable future
At VINCI Construction Grands Projets, we engineer solutions that are not only financially competitive, but work sustainably for the planet. Superior design and construction practises are helping us save 20,000 tonnes of CO2 emissions in two years.
At Clackmannanshire Bridge in Scotland we responded innovatively to sensitive environmental factors. We’ve left a legacy of reduced traffic congestion and pollution for local residents, and have enlarged the local wildlife habitat by hectares.
In our M1 widening project, the road planning material was 100% recycled and included neutralised tar in the sub base, avoiding their transfer to the hazardous waste treatment procedure. It contributes to a hefty 16,000-t CO2 equivalent emission reduction.
On the Hallandsas TBM project in Sweden, all the discharged water from the construction sites is monitored continuously quality and quantity wise before sent back to the natural environment. Also on this project, every chemical products used have been through a complete eco-toxicological evaluation regarding their impacts on human health and environment before being approved.
Just a few of the ways in which VINCI Construction Grands Projets demonstrates sustainability leadership.
Here are a few others:
Lee Tunnel: Busy Lizzie launch And initial rewards
Considerate Constructors Scheme: sustainable excellence in all our UK projects
CO2 Attitude: concrete action deployed in the field
Environment: Attitude Environment, Co2crete Impact, CO2 Attitude
Innovation Awards: (A)live on site garners the Safety prize
Morgan VINCI wins 2009 Green Apple Award
A recycling solution at the M1 central reservation worksite
M1 in the United Kingdom: 1 million hours achieved without a reportable accident requiring downtime
(A)live on site at the M1 worksite
Technical innovation for the piles of the Kincardine Bridge in Scotland
Pride of place for sustainable development at the Kincardine Bridge worksite in Scotland
Environment: Excellent rating for the EIB’s new building
AFAQ 1000NR certification from AFNOR
Projects ongoing
- Crossrail project, lot C512 - Whitechapel station, London, England
- Crossrail project, lot C510 - Liverpool Street and Whitechapel station tunnels, London, England
- Lee tunnel, London, England
Previous projects
- Access tunnel to T5 terminal, Heathrow airport, London, England
- Carrigrenan waste water treatment plant and Cork outfall
- Crossrail project, lot C421 - advance works to the Western Ticket Hall at the new Tottenham Court Road station, London, England
- CTRL, lot 310, West Thames - Ripple Lane to Thames, England
- CTRL, lot 350, bridge crossing the Medway river, England
- CTRL, lot 410, North Downs tunnel, England
- Hotel Royal Victoria Dock hotel, London, England
- M1 widening from junction 25 to junction 28 near Nottingham, England
- Newport Southern Distributor Road, England
- Novotel Whitehall hotel, Leeds, England
- Second Severn River crossing bridge, England
- Upper forth crossing at Kincardine, Scotland
Organization
Alain BONNOT*
CEO
Eric Chambraud*
Director for the British Isles, Northern, Central and Eastern Europe, Russia, Americas
Underground Works Business Line
Lionel Ravix
Managing Director - British Isles
François POGU
Project Director - Lee tunnel
Pierre Paré
Administration and Finance Director - British Isles
Lilia Hanana
Sustainable Development Director, British Isles
Clarence Michel
Senior Marketing and Communication Manager - British Isles
François Bosch
Commercial Manager - Crossrail C510
Cédric NEULAT
Construction Manager - Crossrail C512
* Head Office Paris
Awards & Advertising
Gold National Site Award - Considerate Constructor Scheme - Lee Tunnel2013
Download (PDF File 2,6 Mb)
Dial-up : 6 min 34 s
Broadband : 11 s
Excellence in H&S - Design contribution - Lee Tunnel2013
Download (PDF File 0,1 Mb)
Dial-up : 18 s
Broadband : 1 s
ICE London Civil Engineering Awards - Greatest Contribution - Lee Tunnel2012
Download (PDF File 0,5 Mb)
Dial-up : 1 min 18 s
Broadband : 2 s
ICE London Civil Engineering Awards - Insfrastructure - Lee Tunnel2012
Download (PDF File 0,3 Mb)
Dial-up : 39 s
Broadband : 1 s
Ground Engineering Awards - Editors - Lee Tunnel2012
Download (PDF File 0,1 Mb)
Dial-up : 11 s
Broadband : 1 s
Ground Engineering Awards - Health and Safety - Lee Tunnel2012
Download (PDF File 0,1 Mb)
Dial-up : 19 s
Broadband : 1 s
National Site Award - Considerate Constructor Scheme - Lee Tunnel2012
Download (PDF File 0,2 Mb)
Dial-up : 24 s
Broadband : 1 s
Edie - Sustainable construction - Lee Tunnel2012
Download (PDF File 0,2 Mb)
Dial-up : 36 s
Broadband : 1 s
Green Line - Environmental Innovation - Crossrail C5102011
Download (PDF File 0,1 Mb)
Dial-up : 9 s
Broadband : 1 s
Green Line - Environmental Communications - Crossrail C5102011
Download (PDF File 0,1 Mb)
Dial-up : 9 s
Broadband : 1 s
Transport Project of the Year - Winner 2010 - Clackmannanshire bridge2011
Download (PDF File 0,1 Mb)
Dial-up : 21 s
Broadband : 1 s
Health & Safety Assessment - Highways Agency2010
Download (PDF File 0,7 Mb)
Dial-up : 1 min 39 s
Broadband : 3 s
2009 - Saltire Award - Clackmannanshire bridge2009
Download (PDF File 0,7 Mb)
Dial-up : 1 min 39 s
Broadband : 3 s
2009 - Structural Awards - Clackmannanshire bridge2009
Download (PDF File 0,4 Mb)
Dial-up : 55 s
Broadband : 2 s
2009 - CEEQUAL - Clackmannanshire bridge2009
Download (PDF File 0,5 Mb)
Dial-up : 1 min 14 s
Broadband : 2 s
2009 - Green apple - Clackmannanshire bridge2009
Download (PDF File 0,1 Mb)
Dial-up : 13 s
Broadband : 1 s
2009 - Green Hero - Clackmannanshire bridge2009
Download (PDF File 0,5 Mb)
Dial-up : 1 min 9 s
Broadband : 2 s
2005 - Tunnelling - Airside Road Tunnel, T5, Heathrow Airport2005
Download (PDF File 0,1 Mb)
Dial-up : 13 s
Broadband : 1 s
2005 - Structural Steel Design Awards - Newport Southern Distributor Road2005
Download (PDF File 0,3 Mb)
Dial-up : 40 s
Broadband : 1 s
2005 - Concrete society award - CTRL 350 - Thurrock Viaduct2005
Download (PDF File 0,3 Mb)
Dial-up : 40 s
Broadband : 1 s
2003 - Green apple environment awards - CTRL 3102003
Download (PDF File 0,0 Mb)
Dial-up : 4 s
Broadband : 1 s
2002 - Tunnelling 2002 - CTRL 410 - North Downs Tunnel2002
Download (PDF File 0,3 Mb)
Dial-up : 50 s
Broadband : 1 s
2002 - Concrete society award - CTRL 350 - Medway Viaduct2002
Download (PDF File 0,2 Mb)
Dial-up : 36 s
Broadband : 1 s
2000 - 1 million man hours without a HSE reportable accident - CTRL 3502000
Download (PDF File 0,8 Mb)
Dial-up : 2 min 4 s
Broadband : 3 s
Links
Our projects
Lee Tunnel
http://www.thameswater.co.uk/cps/rde/xchg/corp/hs.xsl/10113.htm
Crossrail - Whitechapel Station tunnels
http://www.crossrail.co.uk/route/stations/whitechapel/
Our joint venture websites
Morgan Sindall, VINCI Construction Grands Projets and Bachy Soletanche
http://www.mvbjv.co.uk
VINCI Construction Grands Projets, VINCI Construction UK and Freyssinet
http://www.vinci-offshorewind.co.uk
VINCI Construction UK and Nuvia Limited
http://www.vnsprojects.comm
Balfour Beatty and VINCI Construction
http://www.balfourbeattyvinci.com
VINCI Construction UK, Balfour Beatty, Morgan Sindall and Beton und Monierbau
http://www.www.bbmv.co.uk
Our joint venture partners
Morgan Sindall
http://www.morgansindall.com
Balfour Beatty
http://www.balfourbeatty.com
VINCI
VINCI advertising campaign
http://www.vinci.com
VINCI in the UK
http://www.vinci-uk.com
VINCI Construction UK
http://www.vinciconstruction.co.uk
Freyssinet
http://www.freyssinet.com
Contact
VINCI Construction Grands Projets - British Isles
Grove House, 551 London Road - Isleworth - TW7 4DS
Tel: +44 208 587 1880
Fax: +44 208 587 1889
info@vinci-construction.co.uk